EPC- Implementation of Lift Irrigation Scheme for Providing Irrigation Facility to 100 Ha of Land in Hillyana (Avarse GP), Huyyaru, and Vadabuvalli. This EPC turnkey project involves the implementation of a Lift Irrigation Scheme to provide water to 100 hectares of land within the Avarse and 76-Haladi GPs. The infrastructure features a Vented Dam across Dasanakatte Hole, designed to optimize water usage in the region. The contract includes full responsibility for construction and a 5-year comprehensive maintenance period to ensure sustained operational success.