
Construction of Gravity Retaining Wall from Ch:11.330 to 11.360 km, Ch:11.410 to 11.540. This civil infrastructure project involves the construction of a Gravity Retaining Wall to stabilize the service road along the Varahi Right Bank Common Canal. The work focuses on specific chainage points (Ch: 11.330 to 11.540) to prevent lateral soil movement and ensure the structural integrity of the canal embankment. The project utilizes high- density gravity-based design principles to provide durable shore protection and support the heavy-duty service road infrastructure.
