
VLBC Distributaries Development (Dy-26 (0.00 to 8.375 km) & Dy-31 (0.00 to1.00 km)). This high-value irrigation project involves extensive civil works for the
Varahi Left Bank Canal (VLBC) distributary network. The scope encompasses Earthwork Excavation, Cement Concrete (CC) Lining, and the construction of vital Cross- Drainage (CD) Works. Notably, the project includes specialized construction for a tunnel section (Ch: 0.00 to 0.150 km) within Dy-31. The initiative is designed to minimize seepage through precision lining and ensure efficient water distribution across the designated command area through robust hydraulic structures.